VCA2619EVM

Mfr. #: VCA2619EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR VCA2619
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: VCA2619EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2619EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 20MHz The 300 V/μs. Current-Output-Channel is 40mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2619 Board type: Fully Populated. The product has 2 - Dual channel per IC.

VCA2619EVM Image

VCA2619EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2619EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 20MHz
  • Slew-Rate 300 V/μs
  • Current-Output-Channel 40mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2619
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -

VCA2619EVM

VCA2619EVM Specifications

VCA2619EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Differential.

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4.75 V ~ 5.25 V

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 20MHz

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 300 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 40mA.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Variable Gain

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is VCA2619.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 2 - Dual

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
153,75 USD
153,75 USD
10
146,06 USD
1 460,62 USD
100
138,38 USD
13 837,50 USD
500
130,69 USD
65 343,75 USD
1000
123,00 USD
123 000,00 USD
Top