| Mfr. #: | VCA2617EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | EVALUATION MODULE FOR VCA2617 |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | VCA2617EVM Scheda dati |


Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 50MHz The 100 V/μs. Current-Output-Channel is 60mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2617 Board type: Fully Populated. The product has 2 - Dual channel per IC.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2617EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: What is the Operating-Temperature of the product?
Q: The Operating-Temperature of the product is -40°C ~ 85°C.
A: What is the Output-Type of the product?
Q: The Output-Type of the product is Differential.
A: What is the Voltage-Supply-Single-Dual of the product?
Q: The Voltage-Supply-Single-Dual of the product is 4.75 V ~ 5.25 V.
A: Is the cutoff frequency of the product -3db-Bandwidth?
Q: Yes, the product's -3db-Bandwidth is indeed 50MHz
A: What is the Slew-Rate of the product?
Q: The Slew-Rate of the product is 100 V/μs.
A: At what frequency does the Current-Output-Channel?
Q: The product Current-Output-Channel is 60mA.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Variable Gain.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed VCA2617
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: Is the cutoff frequency of the product Channels-per-IC?
Q: Yes, the product's Channels-per-IC is indeed 2 - Dual