UCC3889EVM Overview

Product belongs to the - series. The AC/DC, Primary Side is the Main-Purpose. 85 ~ 265 VAC voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 5V, 15V Flyback regulator topology 1.125W Included item: Board. IC package type: TPS77401, UCC3889 Board type: Fully Populated. The product has 2, Non-Isolated outputs.

UCC3889EVM Image

UCC3889EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC3889EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Main-Purpose AC/DC, Primary Side
  • Voltage-Input 85 ~ 265 VAC
  • Frequency-Switching -
  • Current-Output 120mA, 35mA
  • Voltage-Output 5V, 15V
  • Regulator-Topology Flyback
  • Power-Output 1.125W
  • Supplied-Contents Board
  • Utilized-IC-Part TPS77401, UCC3889
  • Board-Type Fully Populated
  • Outputs-and-Type 2, Non-Isolated

UCC3889EVM

UCC3889EVM Specifications

UCC3889EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is AC/DC, Primary Side.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 85 ~ 265 VAC.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is -.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 5V, 15V.

  • A: At what frequency does the Regulator-Topology?

    Q: The product Regulator-Topology is Flyback.

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is 1.125W.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS77401, UCC3889

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 2, Non-Isolated

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
111,26 USD
111,26 USD
10
105,69 USD
1 056,92 USD
100
100,13 USD
10 012,95 USD
500
94,57 USD
47 283,40 USD
1000
89,00 USD
89 004,00 USD