UCC3809EVM

Mfr. #: UCC3809EVM
Produttore: Texas Instruments
Descrizione: EVAL MOD FOR UCC3809/2809
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: UCC3809EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC3809EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Primary/Secondary Side Controllers The DC/DC, Step Down is the Main-Purpose. 32 V ~ 75 V voltage input This product features 'Frequency-Switching' at 380kHz for optimal performance. Output voltage: 3.3V Buck regulator topology - Included item: Board. IC package type: UCC3809 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V Our product measures 69.9 mm x 25.4 mm in dimensions for compact and convenient use. Input Voltage Range: 48 V

UCC3809EVM Image

UCC3809EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC3809EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Primary/Secondary Side Controllers
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 32 V ~ 75 V
  • Frequency-Switching 380kHz
  • Current-Output 3.3A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part UCC3809
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Dimensions 69.9 mm x 25.4 mm
  • Input-Voltage 48 V

UCC3809EVM

UCC3809EVM Specifications

UCC3809EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Primary/Secondary Side Controllers

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 32 V ~ 75 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 380kHz

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 3.3V.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed UCC3809

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 69.9 mm x 25.4 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 48 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
114,63 USD
114,63 USD
10
108,90 USD
1 088,98 USD
100
103,17 USD
10 316,70 USD
500
97,44 USD
48 717,75 USD
1000
91,70 USD
91 704,00 USD
Top