TSW1266EVM

Mfr. #: TSW1266EVM
Produttore: Texas Instruments
Descrizione: TSW1266EVM EVALUATION MODULE
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TSW1266EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW1266EVM Overview

Product belongs to the ADS5402 series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product is designed ADS5402 amplifier. The Interface, Buffer / Receiver is the Main-Purpose. Primary-Attributes: - IC package type: ADS5402, LMH6521, LMK04808 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 5 V supply voltage for reliable performance. This product is an Ideally suited for use as a feedback receiver for transmitter digital predistortion. This tool is designed for the ADS5402. USB interface type

TSW1266EVM Image

TSW1266EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW1266EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series ADS5402
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • For-Use-With ADS5402
  • Main-Purpose Interface, Buffer / Receiver
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part ADS5402, LMH6521, LMK04808
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 5 V
  • Description-Function Ideally suited for use as a feedback receiver for transmitter digital predistortion
  • Tool-Is-For-Evaluation-Of ADS5402
  • Interface-Type USB

TSW1266EVM

TSW1266EVM Specifications

TSW1266EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is ADS5402.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS5402.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Buffer / Receiver

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5402, LMH6521, LMK04808.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Ideally suited for use as a feedback receiver for transmitter digital predistortion

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS5402.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
115,12 USD
115,12 USD
10
109,37 USD
1 093,69 USD
100
103,61 USD
10 361,25 USD
500
97,86 USD
48 928,15 USD
1000
92,10 USD
92 100,00 USD
Top