TSC2007EVM

Mfr. #: TSC2007EVM
Produttore: Texas Instruments
Descrizione: TSC2007EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TSC2007EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2007EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed USB-MODEVM amplifier. Sensitivity: - Interface: I2C Voltage Supply Range: - Touch Screen Sensing range of - Included item: Board. IC package type: TSC2007 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2007. 4-Wire USB interface type

TSC2007EVM Image

TSC2007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Packaging Bulk
  • For-Use-With USB-MODEVM
  • Sensitivity -
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Touch Screen
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TSC2007
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2007
  • Interface-Type 4-Wire USB

TSC2007EVM

TSC2007EVM Specifications

TSC2007EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is USB-MODEVM.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Touch Screen.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TSC2007

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2007

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed 4-Wire USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top