TSC2007EVM-PDK

Mfr. #: TSC2007EVM-PDK
Produttore: Texas Instruments
Descrizione: TSC2007EVM-PDK
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TSC2007EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2007EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product This product is designed USB-MODEVM amplifier. Sensitivity: - Interface: I2C Voltage Supply Range: - Touch Screen Sensing range of - Included item: 2 Boards. IC package type: TSC2007 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2007. 4-Wire USB interface type

TSC2007EVM-PDK Image

TSC2007EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • For-Use-With USB-MODEVM
  • Sensitivity -
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Touch Screen
  • Sensing-Range -
  • Supplied-Contents 2 Boards
  • Embedded No
  • Utilized-IC-Part TSC2007
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2007
  • Interface-Type 4-Wire USB

TSC2007EVM-PDK

TSC2007EVM-PDK Specifications

TSC2007EVM-PDK FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is USB-MODEVM.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Touch Screen.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TSC2007.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TSC2007.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is 4-Wire USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
19,04 USD
19,04 USD
10
18,08 USD
180,83 USD
100
17,13 USD
1 713,15 USD
500
16,18 USD
8 089,90 USD
1000
15,23 USD
15 228,00 USD
Top