TSC2006EVM-PDK

Mfr. #: TSC2006EVM-PDK
Produttore: Texas Instruments
Descrizione: Sensor Development Tools Touch Sensor Development Tools TSC2006EVM-PDK Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TSC2006EVM-PDK Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2006EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2006 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2006.

TSC2006EVM-PDK Image

TSC2006EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2006EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2006
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2006

TSC2006EVM-PDK

TSC2006EVM-PDK Specifications

TSC2006EVM-PDK FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Resistive Touch Sensors

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Touch Screen Controller.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TSC2006.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TSC2006.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
111,26 USD
111,26 USD
10
105,69 USD
1 056,92 USD
100
100,13 USD
10 012,95 USD
500
94,57 USD
47 283,40 USD
1000
89,00 USD
89 004,00 USD
Top