TS3USB3031EVM

Mfr. #: TS3USB3031EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TS3USB3031
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TS3USB3031EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TS3USB3031EVM Overview

Product belongs to the TS3USB3031 series. This product is categorized as Evaluation Modules Type: Multiplexer / Demultiplexer Switches Bulk is the packaging method for this product The Interface, USB 2.0 Switch is the Main-Purpose. Primary-Attributes: - IC package type: TS3USB3031 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TS3USB3031. USB interface type

TS3USB3031EVM Image

TS3USB3031EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3USB3031EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TS3USB3031
  • Product Evaluation Modules
  • Type Multiplexer / Demultiplexer Switches
  • Packaging Bulk
  • Main-Purpose Interface, USB 2.0 Switch
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TS3USB3031
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TS3USB3031
  • Interface-Type USB

TS3USB3031EVM

TS3USB3031EVM Specifications

TS3USB3031EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed TS3USB3031

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Multiplexer / Demultiplexer Switches.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, USB 2.0 Switch.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TS3USB3031

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TS3USB3031

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
223,50 USD
223,50 USD
10
212,32 USD
2 123,25 USD
100
201,15 USD
20 115,00 USD
500
189,98 USD
94 987,50 USD
1000
178,80 USD
178 800,00 USD
Top