TS3A227E-EVM

Mfr. #: TS3A227E-EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE TS3A227E
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TS3A227E-EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TS3A227E-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Audio Switches Bulk is the packaging method for this product The Interface, Analog Switch is the Main-Purpose. Primary-Attributes: Audio Headset Switch IC package type: TS3A227E This tool is designed for the TS3A227E.

TS3A227E-EVM Image

TS3A227E-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3A227E-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Audio Switches
  • Packaging Bulk
  • Main-Purpose Interface, Analog Switch
  • Primary-Attributes Audio Headset Switch
  • Embedded No
  • Utilized-IC-Part TS3A227E
  • Tool-Is-For-Evaluation-Of TS3A227E

TS3A227E-EVM

TS3A227E-EVM Specifications

TS3A227E-EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Switches

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Switch.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Audio Headset Switch.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TS3A227E.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TS3A227E

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top