TRF37T05EVM

Mfr. #: TRF37T05EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TRF37T05
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TRF37T05EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37T05EVM Overview

Compatible with TRF37T05. Product belongs to the - series. This product is categorized as Evaluation Boards Type: Modulator This product's 300MHz ~ 4GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37T05.

TRF37T05EVM Image

TRF37T05EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37T05EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37T05
  • Series -
  • Product Evaluation Boards
  • Type Modulator
  • Frequency 300MHz ~ 4GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37T05

TRF37T05EVM

TRF37T05EVM Specifications

TRF37T05EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is TRF37T05.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Modulator.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 300MHz ~ 4GHz.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TRF37T05.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
230,43 USD
230,43 USD
10
218,91 USD
2 189,08 USD
100
207,39 USD
20 738,70 USD
500
195,87 USD
97 932,75 USD
1000
184,34 USD
184 344,00 USD
Top