TRF2443EVM

Mfr. #: TRF2443EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TRF2443-445
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TRF2443EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF2443EVM Overview

Compatible with TRF2443. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Transceiver Bulk is the packaging method for this product This product's 340MHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This product is an Evaluation board for the TRF2443 integrated IF transceiver for broadband wireless applications. This tool is designed for the TRF2443. USB interface type

TRF2443EVM Image

TRF2443EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF2443EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF2443
  • Series -
  • Product Evaluation Modules
  • Type Transceiver
  • Packaging Bulk
  • Frequency 340MHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Description-Function Evaluation board for the TRF2443 integrated IF transceiver for broadband wireless applications
  • Tool-Is-For-Evaluation-Of TRF2443
  • Interface-Type USB

TRF2443EVM

TRF2443EVM Specifications

TRF2443EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is TRF2443.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Transceiver.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 340MHz

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation board for the TRF2443 integrated IF transceiver for broadband wireless applications

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TRF2443.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
560,79 USD
560,79 USD
10
532,75 USD
5 327,50 USD
100
504,71 USD
50 471,10 USD
500
476,67 USD
238 335,75 USD
1000
448,63 USD
448 632,00 USD
Top