TPS6735EVM

Mfr. #: TPS6735EVM
Produttore: Texas Instruments
Descrizione: EVAL MOD FOR TPS6735
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS6735EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS6735EVM Overview

Product belongs to the - series. The DC/DC, Negative Inverter is the Main-Purpose. 4 V ~ 6.2 V voltage input This product features 'Frequency-Switching' at 160Hz for optimal performance. Output voltage: -5V Inverting regulator topology - Included item: Board. IC package type: TPS6735 Board type: Fully Populated. The product has 1, Non-Isolated outputs.

TPS6735EVM Image

TPS6735EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS6735EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Main-Purpose DC/DC, Negative Inverter
  • Voltage-Input 4 V ~ 6.2 V
  • Frequency-Switching 160Hz
  • Current-Output 200mA
  • Voltage-Output -5V
  • Regulator-Topology Inverting
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS6735
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated

TPS6735EVM

TPS6735EVM Specifications

TPS6735EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Negative Inverter.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 4 V ~ 6.2 V.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is 160Hz.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is -5V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Inverting

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS6735

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 1, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
96,70 USD
96,70 USD
10
91,87 USD
918,70 USD
100
87,03 USD
8 703,45 USD
500
82,20 USD
41 099,65 USD
1000
77,36 USD
77 364,00 USD
Top