TPS65218EVM-100

Mfr. #: TPS65218EVM-100
Produttore: Texas Instruments
Descrizione: EVAL BOARD FOR TPS65218
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS65218EVM-100 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65218EVM-100 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized This product is designed TPS65218 amplifier. The Power Management, Integrated Power Supply is the Main-Purpose. Primary-Attributes: - IC package type: TPS65218 This tool is designed for the TPS65218. I2C USB interface type Input Voltage Range: 2.7 V to 5.5 V

TPS65218EVM-100 Image

TPS65218EVM-100

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65218EVM-100 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • For-Use-With TPS65218
  • Main-Purpose Power Management, Integrated Power Supply
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS65218
  • Tool-Is-For-Evaluation-Of TPS65218
  • Interface-Type I2C USB
  • Input-Voltage 2.7 V to 5.5 V

TPS65218EVM-100

TPS65218EVM-100 Specifications

TPS65218EVM-100 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Management Specialized

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TPS65218

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Integrated Power Supply.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS65218.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS65218.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C USB

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.7 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
148,50 USD
148,50 USD
10
141,08 USD
1 410,75 USD
100
133,65 USD
13 365,00 USD
500
126,22 USD
63 112,50 USD
1000
118,80 USD
118 800,00 USD