TPS65161EVM-194

Mfr. #: TPS65161EVM-194
Produttore: Texas Instruments
Descrizione: EVAL MOD FOR TPS65161
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS65161EVM-194 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65161EVM-194 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Power Management Specialized Bulk is the packaging method for this product The Special Purpose DC/DC, LCD Supply is the Main-Purpose. 11.4 V ~ 12.6 V voltage input This product features 'Frequency-Switching' at 750kHz for optimal performance. Output voltage: 3.3V, 18V, 32V, -5V Buck-Boost regulator topology 32.8W Included item: Board. IC package type: TPS65161 Board type: Fully Populated. The product has 4, Non-Isolated outputs. This tool is designed for the TPS65161. Our product measures 96.5 mm x 63.5 mm in dimensions for compact and convenient use. Input Voltage Range: 15 V

TPS65161EVM-194 Image

TPS65161EVM-194

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65161EVM-194 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Power Management Specialized
  • Packaging Bulk
  • Main-Purpose Special Purpose DC/DC, LCD Supply
  • Voltage-Input 11.4 V ~ 12.6 V
  • Frequency-Switching 750kHz
  • Current-Output 2.3A, 1.3A, 50mA, 50mA
  • Voltage-Output 3.3V, 18V, 32V, -5V
  • Regulator-Topology Buck-Boost
  • Power-Output 32.8W
  • Supplied-Contents Board
  • Utilized-IC-Part TPS65161
  • Board-Type Fully Populated
  • Outputs-and-Type 4, Non-Isolated
  • Tool-Is-For-Evaluation-Of TPS65161
  • Dimensions 96.5 mm x 63.5 mm
  • Input-Voltage 15 V

TPS65161EVM-194

TPS65161EVM-194 Specifications

TPS65161EVM-194 FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Power Management Specialized.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Special Purpose DC/DC, LCD Supply

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 11.4 V ~ 12.6 V

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 750kHz.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 3.3V, 18V, 32V, -5V

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck-Boost

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed 32.8W

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS65161.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is 4, Non-Isolated.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS65161

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 96.5 mm x 63.5 mm

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 15 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top