TPS650731EVM-430

Mfr. #: TPS650731EVM-430
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TPS650731-430
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS650731EVM-430 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS650731EVM-430 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: PMIC Solutions Bulk is the packaging method for this product The Power Management, Battery Charger, Power Supply is the Main-Purpose. Primary-Attributes: Li-Ion Battery Charger With Power Path Management IC package type: TPS650731 Output voltage: 1.2 V 1.35 V 1.8 V This product is an TPS6507xEVM-430 is a fully assembled and tested platform for evaluating the performance of the TPS6507x single-chip power management devices. This tool is designed for the TPS650731. I2C USB interface type Input Voltage Range: 5 V Output current: 600 mA 1.5 A

TPS650731EVM-430 Image

TPS650731EVM-430

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS650731EVM-430 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type PMIC Solutions
  • Packaging Bulk
  • Main-Purpose Power Management, Battery Charger, Power Supply
  • Primary-Attributes Li-Ion Battery Charger With Power Path Management
  • Embedded No
  • Utilized-IC-Part TPS650731
  • Output-Voltage 1.2 V 1.35 V 1.8 V
  • Description-Function TPS6507xEVM-430 is a fully assembled and tested platform for evaluating the performance of the TPS6507x single-chip power management devices
  • Tool-Is-For-Evaluation-Of TPS650731
  • Interface-Type I2C USB
  • Input-Voltage 5 V
  • Output-Current 600 mA 1.5 A

TPS650731EVM-430

TPS650731EVM-430 Specifications

TPS650731EVM-430 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Battery Charger, Power Supply.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Li-Ion Battery Charger With Power Path Management.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS650731

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 1.2 V 1.35 V 1.8 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TPS6507xEVM-430 is a fully assembled and tested platform for evaluating the performance of the TPS6507x single-chip power management devices.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS650731.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C USB.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 5 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 600 mA 1.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
130,26 USD
130,26 USD
10
123,75 USD
1 237,47 USD
100
117,23 USD
11 723,40 USD
500
110,72 USD
55 360,50 USD
1000
104,21 USD
104 208,00 USD
Top