TPS62401EVM-167

Mfr. #: TPS62401EVM-167
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TPS62401-167
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS62401EVM-167 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62401EVM-167 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 2.5 V ~ 6 V voltage input This product features 'Frequency-Switching' at 2.25MHz for optimal performance. Output voltage: 1.8V, 1.1V or 1.575V Buck regulator topology - Included item: Board, Cable. IC package type: TPS62401 Board type: Fully Populated. The product has 2, Non-Isolated outputs. Output voltage: 6 V This tool is designed for the TPS62401. Our product measures 45.7 mm x 40.5 mm in dimensions for compact and convenient use. Input Voltage Range: 2.5 V to 6 V

TPS62401EVM-167 Image

TPS62401EVM-167

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62401EVM-167 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 2.5 V ~ 6 V
  • Frequency-Switching 2.25MHz
  • Current-Output 600mA, 400mA
  • Voltage-Output 1.8V, 1.1V or 1.575V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board, Cable
  • Utilized-IC-Part TPS62401
  • Board-Type Fully Populated
  • Outputs-and-Type 2, Non-Isolated
  • Output-Voltage 6 V
  • Tool-Is-For-Evaluation-Of TPS62401
  • Dimensions 45.7 mm x 40.5 mm
  • Input-Voltage 2.5 V to 6 V

TPS62401EVM-167

TPS62401EVM-167 Specifications

TPS62401EVM-167 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed DC/DC, Step Down

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 2.5 V ~ 6 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 2.25MHz

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 1.8V, 1.1V or 1.575V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board, Cable

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS62401

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 2, Non-Isolated

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 6 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS62401

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 45.7 mm x 40.5 mm.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 2.5 V to 6 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top