TPS62130EVM-505

Mfr. #: TPS62130EVM-505
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TPS62130-505
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS62130EVM-505 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62130EVM-505 Overview

Product belongs to the DCS-Control series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 3.7 V ~ 17 V voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 3.3V Buck regulator topology - Included item: Board. IC package type: TPS62130 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS62130. Input Voltage Range: 3.7 V to 17 V Output current: 3 A

TPS62130EVM-505 Image

TPS62130EVM-505

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62130EVM-505 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series DCS-Control
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 3.7 V ~ 17 V
  • Frequency-Switching -
  • Current-Output 3A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS62130
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS62130
  • Input-Voltage 3.7 V to 17 V
  • Output-Current 3 A

TPS62130EVM-505

TPS62130EVM-505 Specifications

TPS62130EVM-505 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DCS-Control.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 3.7 V ~ 17 V.

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is -.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 3.3V.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS62130.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS62130.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 3.7 V to 17 V

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 3 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top