TPS61196EVM-600

Mfr. #: TPS61196EVM-600
Produttore: Texas Instruments
Descrizione: LED Lighting Development Tools TPS61196 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS61196EVM-600 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61196EVM-600 Overview

Product belongs to the TPS61196 series. Bulk is the packaging method for this product 10 V ~ 30 V voltage input Current-Output-Channel is 200mA Output voltage: 60V Included item: Board. IC package type: TPS61196 The product has 6, Non-Isolated outputs.

TPS61196EVM-600 Image

TPS61196EVM-600

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61196EVM-600 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series TPS61196
  • Packaging Bulk
  • Features Dimmable
  • Voltage-Input 10 V ~ 30 V
  • Current-Output-Channel 200mA
  • Voltage-Output 60V
  • Supplied-Contents Board
  • Utilized-IC-Part TPS61196
  • Outputs-and-Type 6, Non-Isolated

TPS61196EVM-600

TPS61196EVM-600 Specifications

TPS61196EVM-600 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TPS61196.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 10 V ~ 30 V

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 200mA.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 60V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS61196.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 6, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
0,00 USD
0,00 USD
10
0,00 USD
0,00 USD
100
0,00 USD
0,00 USD
500
0,00 USD
0,00 USD
1000
0,00 USD
0,00 USD
Top