TPS60231EVM-047

Mfr. #: TPS60231EVM-047
Produttore: Texas Instruments
Descrizione: EVALUATION MOD TPS60231EVM-047
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPS60231EVM-047 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS60231EVM-047 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Charge Pumps 2.7 V ~ 6 V voltage input Current-Output-Channel is 20mA Output voltage: - Included item: Board. IC package type: TPS60231 The product has 3, Non-Isolated outputs. This tool is designed for the TPS60231. Our product measures 39.4 mm x 30.4 mm in dimensions for compact and convenient use. Input Voltage Range: 2.7 V to 6 V

TPS60231EVM-047 Image

TPS60231EVM-047

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS60231EVM-047 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series -
  • Product Evaluation Boards
  • Type Charge Pumps
  • Features Charge Pump
  • Voltage-Input 2.7 V ~ 6 V
  • Current-Output-Channel 20mA
  • Voltage-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS60231
  • Outputs-and-Type 3, Non-Isolated
  • Tool-Is-For-Evaluation-Of TPS60231
  • Dimensions 39.4 mm x 30.4 mm
  • Input-Voltage 2.7 V to 6 V

TPS60231EVM-047

TPS60231EVM-047 Specifications

TPS60231EVM-047 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Charge Pumps

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 2.7 V ~ 6 V.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 20mA.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS60231

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 3, Non-Isolated

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS60231

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 39.4 mm x 30.4 mm.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.7 V to 6 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top