| Mfr. #: | TPS22968EVM-007 |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | EVAL MODULE FOR TPS22968 |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TPS22968EVM-007 Scheda dati |


Product belongs to the TPS22968 series. This product is categorized as Evaluation Modules Type: Load Switches The Power Management, Power Distribution Switch (Load Switch) is the Main-Purpose. Primary-Attributes: - IC package type: TPS22968 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product is an Evaluation module contains dual channel ultra low on resistance 4 A load switch. This tool is designed for the TPS22968.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22968EVM-007 Specifications
A: What is the Series of the product?
Q: The Series of the product is TPS22968.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Load Switches
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Power Distribution Switch (Load Switch).
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TPS22968.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 85 C.
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed Evaluation module contains dual channel ultra low on resistance 4 A load switch
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS22968