TPL5100EVM

Mfr. #: TPL5100EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR TPL5100
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPL5100EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPL5100EVM Overview

Product belongs to the TPL5100 series. This product is categorized as Evaluation Boards Type: Clock and Data Retiming Bulk is the packaging method for this product This product is designed C2000 MSP430 Stellaris amplifier. The Timing, Timer is the Main-Purpose. Primary-Attributes: Watchdog Timer IC package type: TPL5100 This product is an Allows designers to configure delay timers on the TPL5100 and measure very low current consumption. This tool is designed for the TPL5100.

TPL5100EVM Image

TPL5100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPL5100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TPL5100
  • Product Evaluation Boards
  • Type Clock and Data Retiming
  • Packaging Bulk
  • For-Use-With C2000 MSP430 Stellaris
  • Main-Purpose Timing, Timer
  • Primary-Attributes Watchdog Timer
  • Embedded No
  • Utilized-IC-Part TPL5100
  • Description-Function Allows designers to configure delay timers on the TPL5100 and measure very low current consumption
  • Tool-Is-For-Evaluation-Of TPL5100

TPL5100EVM

TPL5100EVM Specifications

TPL5100EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed TPL5100

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Clock and Data Retiming.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is C2000 MSP430 Stellaris.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Timer.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Watchdog Timer.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPL5100

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Allows designers to configure delay timers on the TPL5100 and measure very low current consumption.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPL5100.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
23,14 USD
23,14 USD
10
21,99 USD
219,88 USD
100
20,83 USD
2 083,05 USD
500
19,67 USD
9 836,65 USD
1000
18,52 USD
18 516,00 USD
Top