TPD5S116EVM

Mfr. #: TPD5S116EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TPD5S116
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPD5S116EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPD5S116EVM Overview

Product belongs to the TPD5A116 series. This product is categorized as Evaluation Modules Type: HDMI Display Interface This product is designed TPD5S116 amplifier. The Circuit Protection, Electrostatic Discharge (ESD) is the Main-Purpose. Primary-Attributes: - IC package type: TPD4S010, TPD5S116, TPD8S009 This product operates at a 3.3 V supply voltage for reliable performance. This product is an Provides full functionality of TPD5S116. This tool is designed for the TPD5S116. HDMI I2C interface type

TPD5S116EVM Image

TPD5S116EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPD5S116EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TPD5A116
  • Product Evaluation Modules
  • Type HDMI Display Interface
  • For-Use-With TPD5S116
  • Main-Purpose Circuit Protection, Electrostatic Discharge (ESD)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPD4S010, TPD5S116, TPD8S009
  • Operating-Supply-Voltage 3.3 V
  • Description-Function Provides full functionality of TPD5S116
  • Tool-Is-For-Evaluation-Of TPD5S116
  • Interface-Type HDMI I2C

TPD5S116EVM

TPD5S116EVM Specifications

TPD5S116EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is TPD5A116.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is HDMI Display Interface.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TPD5S116

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Circuit Protection, Electrostatic Discharge (ESD).

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPD4S010, TPD5S116, TPD8S009.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Provides full functionality of TPD5S116

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPD5S116.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed HDMI I2C

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
76,04 USD
76,04 USD
10
72,23 USD
722,33 USD
100
68,43 USD
6 843,15 USD
500
64,63 USD
32 314,90 USD
1000
60,83 USD
60 828,00 USD
Top