TPD1S514-3EVM

Mfr. #: TPD1S514-3EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TPD1S514
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPD1S514-3EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPD1S514-3EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized This product is designed TPD1S514-3 amplifier. The Circuit Protection, Electrostatic Discharge (ESD) is the Main-Purpose. Primary-Attributes: - IC package type: TPD1S514 Maximum operating temperature of + 85 V Minimum operating temperature: - 40 C This product is an TPD1S514-3 evaluation module. This tool is designed for the TPD1S514-3. USB interface type Input Voltage Range: 12 V Output current: 3.5 A

TPD1S514-3EVM Image

TPD1S514-3EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPD1S514-3EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • For-Use-With TPD1S514-3
  • Main-Purpose Circuit Protection, Electrostatic Discharge (ESD)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPD1S514
  • Maximum-Operating-Temperature + 85 V
  • Minimum-Operating-Temperature - 40 C
  • Description-Function TPD1S514-3 evaluation module
  • Tool-Is-For-Evaluation-Of TPD1S514-3
  • Interface-Type USB
  • Input-Voltage 12 V
  • Output-Current 3.5 A

TPD1S514-3EVM

TPD1S514-3EVM Specifications

TPD1S514-3EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Power Management Specialized.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TPD1S514-3.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Circuit Protection, Electrostatic Discharge (ESD).

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPD1S514.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 V.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is TPD1S514-3 evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPD1S514-3.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 12 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 3.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
0,00 USD
0,00 USD
10
0,00 USD
0,00 USD
100
0,00 USD
0,00 USD
500
0,00 USD
0,00 USD
1000
0,00 USD
0,00 USD
Top