TPA6011A4EVM

Mfr. #: TPA6011A4EVM
Produttore: Texas Instruments
Descrizione: EVAL MOD FOR TPA6011A4
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPA6011A4EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA6011A4EVM Overview

Product belongs to the - series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) with Stereo Headphones Voltage Supply Range: 4 V ~ 5.5 V Maximum Output Power of 3W x 2 @ 3 Ohm for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: TPA6011A4 Board type: Fully Populated. This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the TPA6011A4.

TPA6011A4EVM Image

TPA6011A4EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA6011A4EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Type Audio Amplifiers
  • Output-Type 2-Channel (Stereo) with Stereo Headphones
  • Voltage-Supply 4 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load 3W x 2 @ 3 Ohm
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Output-Power 2 W
  • Utilized-IC-Part TPA6011A4
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of TPA6011A4

TPA6011A4EVM

TPA6011A4EVM Specifications

TPA6011A4EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifiers.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo) with Stereo Headphones.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 4 V ~ 5.5 V

  • A: What is the Max-Output-Power-x-Channels-Load of the product?

    Q: The Max-Output-Power-x-Channels-Load of the product is 3W x 2 @ 3 Ohm.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Class AB.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPA6011A4.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V to 15 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPA6011A4.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top