TPA3123D2EVM

Mfr. #: TPA3123D2EVM
Produttore: Texas Instruments
Descrizione: TPA3123D2EVM
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPA3123D2EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3123D2EVM Overview

Product belongs to the - series. Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 10 V ~ 30 V Maximum Output Power of 25W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA3123D2 Board type: Fully Populated. This product operates at a 10 V to 30 V supply voltage for reliable performance. This tool is designed for the TPA3123D2. 2 A is 92 nA.

TPA3123D2EVM Image

TPA3123D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3123D2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 10 V ~ 30 V
  • Max-Output-Power-x-Channels-Load 25W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Output-Power 24 W
  • Utilized-IC-Part TPA3123D2
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 10 V to 30 V
  • Tool-Is-For-Evaluation-Of TPA3123D2
  • Operating-Supply-Current 2 A

TPA3123D2EVM

TPA3123D2EVM Specifications

TPA3123D2EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo).

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 10 V ~ 30 V

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 25W x 2 @ 4 Ohm

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Class D

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPA3123D2.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 10 V to 30 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPA3123D2.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 2 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
148,50 USD
148,50 USD
10
141,08 USD
1 410,75 USD
100
133,65 USD
13 365,00 USD
500
126,22 USD
63 112,50 USD
1000
118,80 USD
118 800,00 USD
Top