TPA2013D1EVM

Mfr. #: TPA2013D1EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPA2013D1EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2013D1EVM Overview

Product belongs to the - series. Output-Type: 1-Channel (Mono) Voltage Supply Range: 1.8 V ~ 5.5 V Maximum Output Power of 2.7W x 1 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA2013D1 Board type: Fully Populated.

TPA2013D1EVM Image

TPA2013D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2013D1EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Output-Type 1-Channel (Mono)
  • Voltage-Supply 1.8 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load 2.7W x 1 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Utilized-IC-Part TPA2013D1
  • Board-Type Fully Populated

TPA2013D1EVM

TPA2013D1EVM Specifications

TPA2013D1EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is 1-Channel (Mono).

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 1.8 V ~ 5.5 V

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 2.7W x 1 @ 4 Ohm

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Class D.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPA2013D1.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
69,75 USD
69,75 USD
10
66,26 USD
662,62 USD
100
62,78 USD
6 277,50 USD
500
59,29 USD
29 643,75 USD
1000
55,80 USD
55 800,00 USD
Top