TPA2008D2EVM

Mfr. #: TPA2008D2EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TPA2008D2
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TPA2008D2EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2008D2EVM Overview

Product belongs to the - series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 4.5 V ~ 5.5 V Maximum Output Power of 3W x 2 @ 3 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA2008D2 Board type: Fully Populated. This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the TPA2008D2. 7 mA is 92 nA.

TPA2008D2EVM Image

TPA2008D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2008D2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Type Audio Amplifiers
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 4.5 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load 3W x 2 @ 3 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Output-Power 3 W
  • Utilized-IC-Part TPA2008D2
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of TPA2008D2
  • Operating-Supply-Current 7 mA

TPA2008D2EVM

TPA2008D2EVM Specifications

TPA2008D2EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo).

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 4.5 V ~ 5.5 V.

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 3W x 2 @ 3 Ohm

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPA2008D2

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V to 15 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPA2008D2

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 7 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top