TMP708EVM

Mfr. #: TMP708EVM
Produttore: Texas Instruments
Descrizione: Sensor Development Tools Temperature Sensor Development Tools TMP708 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TMP708EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP708EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP708 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP708.

TMP708EVM Image

TMP708EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP708EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Sensitivity ±3°C
  • Interface Analog
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Thermostat
  • Sensing-Range 0°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP708
  • Maximum-Operating-Temperature + 125 C
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of TMP708

TMP708EVM

TMP708EVM Specifications

TMP708EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±3°C.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed Analog

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Thermostat.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed 0°C ~ 125°C

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP708.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5.5 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP708.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top