TMP122EVM

Mfr. #: TMP122EVM
Produttore: Texas Instruments
Descrizione: Sensor Development Tools Temperature Sensor Development Tools TMP122 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TMP122EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP122EVM Overview

Product belongs to the - series. Sensitivity: ±0.5°C Interface: SPI Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 150°C Included item: Board. IC package type: TMP122

TMP122EVM Image

TMP122EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP122EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Sensitivity ±0.5°C
  • Interface SPI
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -55°C ~ 150°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP122

TMP122EVM

TMP122EVM Specifications

TMP122EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±0.5°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is SPI.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -55°C ~ 150°C.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP122

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
96,70 USD
96,70 USD
10
91,87 USD
918,70 USD
100
87,03 USD
8 703,45 USD
500
82,20 USD
41 099,65 USD
1000
77,36 USD
77 364,00 USD