| Mfr. #: | TMP112EVM |
|---|---|
| Produttore: | Texas Instruments |
| Descrizione: | Sensor Development Tools Temperature Sensor Development Tools TMP112EVM |
| Ciclo vitale: | Nuovo da questo produttore. |
| Scheda dati: | TMP112EVM Scheda dati |


Product belongs to the TMP112 series. This product is categorized as Evaluation Boards Type: Temperature Sensors This product is designed SM-USB-DIG amplifier. Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP112 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TMP112.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP112EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed TMP112
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Temperature Sensors.
A: At what frequency does the For-Use-With?
Q: The product For-Use-With is SM-USB-DIG.
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is ±1°C.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed I2C
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is -.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Temperature.
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is -40°C ~ 125°C.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TMP112
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3.3 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TMP112.