TMP104EVM

Mfr. #: TMP104EVM
Produttore: Texas Instruments
Descrizione: Sensor Development Tools Temperature Sensor Development Tools TMP104 Eval Mod
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TMP104EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP104EVM Overview

Product belongs to the SMAARTWIRE series. Sensitivity: ±3°C Interface: - Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP104

TMP104EVM Image

TMP104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series SMAARTWIRE
  • Sensitivity ±3°C
  • Interface -
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part TMP104

TMP104EVM

TMP104EVM Specifications

TMP104EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed SMAARTWIRE

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±3°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is -.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -40°C ~ 125°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is 2 Boards, Cables.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP104.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
112,50 USD
112,50 USD
10
106,88 USD
1 068,75 USD
100
101,25 USD
10 125,00 USD
500
95,62 USD
47 812,50 USD
1000
90,00 USD
90 000,00 USD
Top