TMP102EVM

Mfr. #: TMP102EVM
Produttore: Texas Instruments
Descrizione: Sensor Development Tools Temperature Sensor Development Tools TMP102 EVAL MOD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TMP102EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP102EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±3°C Interface: Serial Voltage Supply Range: 3.3V Temperature Sensing range of -40°C ~ 125°C Included item: Board, Cables. IC package type: TMP102 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.4 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TMP102. I2C USB interface type

TMP102EVM Image

TMP102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP102EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±3°C
  • Interface Serial
  • Voltage-Supply 3.3V
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents Board, Cables
  • Embedded No
  • Utilized-IC-Part TMP102
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.4 V to 3.6 V
  • Tool-Is-For-Evaluation-Of TMP102
  • Interface-Type I2C USB

TMP102EVM

TMP102EVM Specifications

TMP102EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±3°C

  • A: At what frequency does the Interface?

    Q: The product Interface is Serial.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 3.3V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -40°C ~ 125°C.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board, Cables.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP102

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.4 V to 3.6 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP102

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
73,50 USD
73,50 USD
10
69,82 USD
698,25 USD
100
66,15 USD
6 615,00 USD
500
62,48 USD
31 237,50 USD
1000
58,80 USD
58 800,00 USD
Top