TMP100EVM

Mfr. #: TMP100EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR TMP100
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TMP100EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP100EVM Overview

Product belongs to the - series. Sensitivity: ±0.5°C Interface: I2C, SMBus Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 125°C Included item: Board. IC package type: TMP100

TMP100EVM Image

TMP100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Sensitivity ±0.5°C
  • Interface I2C, SMBus
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -55°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP100

TMP100EVM

TMP100EVM Specifications

TMP100EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±0.5°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C, SMBus.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -55°C ~ 125°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP100.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
96,70 USD
96,70 USD
10
91,87 USD
918,70 USD
100
87,03 USD
8 703,45 USD
500
82,20 USD
41 099,65 USD
1000
77,36 USD
77 364,00 USD
Top