Product belongs to the - series. This product is categorized as Evaluation Boards Type: LDO Voltage Regulators Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C 2 V ~ 5.5 V voltage input Output voltage: 2.8V Included item: Board. IC package type: TLV70028 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Fixed. This tool is designed for the TLV70028.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV70028EVM-463 Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: What is the Type of the product?
Q: The Type of the product is LDO Voltage Regulators.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product Operating-Temperature?
Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 125°C
A: What is the Voltage-Input of the product?
Q: The Voltage-Input of the product is 2 V ~ 5.5 V.
A: What is the Voltage-Output of the product?
Q: The Voltage-Output of the product is 2.8V.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TLV70028.
A: Is the cutoff frequency of the product Board-Type?
Q: Yes, the product's Board-Type is indeed Fully Populated
A: Is the cutoff frequency of the product Channels-per-IC?
Q: Yes, the product's Channels-per-IC is indeed 1 - Single
A: What is the Regulator-Type of the product?
Q: The Regulator-Type of the product is Positive Fixed.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TLV70028