TLV70018EVM-503

Mfr. #: TLV70018EVM-503
Produttore: Texas Instruments
Descrizione: TLV70018 Linear Regulator Evaluation Board
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TLV70018EVM-503 Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV70018EVM-503 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Linear Voltage Regulators Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C 2 V ~ 5.5 V voltage input Output voltage: 1.8V Included item: Board. IC package type: TLV70018 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Fixed. Output voltage: 4.8 V This tool is designed for the TLV70018. Our product measures 2 mm x 2.1 mm in dimensions for compact and convenient use. Input Voltage Range: 2 V to 5.5 V

TLV70018EVM-503 Image

TLV70018EVM-503

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV70018EVM-503 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Linear Voltage Regulators
  • Series -
  • Product Evaluation Boards
  • Type Linear Voltage Regulators
  • Packaging Bulk
  • Operating-Temperature -40°C ~ 125°C
  • Voltage-Input 2 V ~ 5.5 V
  • Current-Output 200mA
  • Voltage-Output 1.8V
  • Supplied-Contents Board
  • Utilized-IC-Part TLV70018
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Regulator-Type Positive Fixed
  • Output-Voltage 4.8 V
  • Tool-Is-For-Evaluation-Of TLV70018
  • Dimensions 2 mm x 2.1 mm
  • Input-Voltage 2 V to 5.5 V

TLV70018EVM-503

TLV70018EVM-503 Specifications

TLV70018EVM-503 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Linear Voltage Regulators

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 125°C

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 2 V ~ 5.5 V.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 1.8V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TLV70018

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 1 - Single.

  • A: What is the Regulator-Type of the product?

    Q: The Regulator-Type of the product is Positive Fixed.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 4.8 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TLV70018.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 2 mm x 2.1 mm.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 2 V to 5.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
30,00 USD
30,00 USD
10
28,50 USD
285,00 USD
100
27,00 USD
2 700,00 USD
500
25,50 USD
12 750,00 USD
1000
24,00 USD
24 000,00 USD
Top