THS770006EVM

Mfr. #: THS770006EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR THS770006
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: THS770006EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS770006EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 2.4GHz The 3200 V/μs. Current-Output-Channel is 80mA The amplifier is of Differential type. Included item: Board. IC package type: THS770006 Board type: Fully Populated. The product has 1 - Single channel per IC. This product operates at a 2.25 V to 2.75 V supply voltage for reliable performance. This product is an ADC Driver Amplifier Evaluation Module. This tool is designed for the THS770006.

THS770006EVM Image

THS770006EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS770006EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 2.4GHz
  • Slew-Rate 3200 V/μs
  • Current-Output-Channel 80mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part THS770006
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 100mA
  • Operating-Supply-Voltage 2.25 V to 2.75 V
  • Description-Function ADC Driver Amplifier Evaluation Module
  • Tool-Is-For-Evaluation-Of THS770006

THS770006EVM

THS770006EVM Specifications

THS770006EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 85°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Differential

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4.75 V ~ 5.25 V

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 2.4GHz.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 3200 V/μs.

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed 80mA

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Differential

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS770006

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 1 - Single

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.25 V to 2.75 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is ADC Driver Amplifier Evaluation Module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is THS770006.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
114,63 USD
114,63 USD
10
108,90 USD
1 088,98 USD
100
103,17 USD
10 316,70 USD
500
97,44 USD
48 717,75 USD
1000
91,70 USD
91 704,00 USD
Top