THS7360EVM

Mfr. #: THS7360EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR THS7360
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: THS7360EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS7360EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product The Video, Amplifier, 6 Channel is the Main-Purpose. Primary-Attributes: - IC package type: THS7360 This product operates at a 5.5 V supply voltage for reliable performance. This product is an Evaluation Module. This tool is designed for the THS7360. 0.1 uA is 92 nA.

THS7360EVM Image

THS7360EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS7360EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Packaging Bulk
  • Main-Purpose Video, Amplifier, 6 Channel
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part THS7360
  • Operating-Supply-Voltage 5.5 V
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of THS7360
  • Operating-Supply-Current 0.1 uA

THS7360EVM

THS7360EVM Specifications

THS7360EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Video, Amplifier, 6 Channel.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is THS7360.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5.5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation Module

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is THS7360.

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 0.1 uA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
28,64 USD
28,64 USD
10
27,20 USD
272,03 USD
100
25,77 USD
2 577,15 USD
500
24,34 USD
12 169,90 USD
1000
22,91 USD
22 908,00 USD
Top