THS6042EVM

Mfr. #: THS6042EVM
Produttore: Texas Instruments
Descrizione: EVAL MOD FOR THS6042
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: THS6042EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS6042EVM Overview

Product belongs to the - series. The Interface, Line Driver, ADSL is the Main-Purpose. Primary-Attributes: - IC package type: THS6042

THS6042EVM Image

THS6042EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS6042EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Line Driver, ADSL
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part THS6042

THS6042EVM

THS6042EVM Specifications

THS6042EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Line Driver, ADSL.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS6042

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
96,70 USD
96,70 USD
10
91,87 USD
918,70 USD
100
87,03 USD
8 703,45 USD
500
82,20 USD
41 099,65 USD
1000
77,36 USD
77 364,00 USD
Top