THS4211EVM-UG

Mfr. #: THS4211EVM-UG
Produttore: Texas Instruments
Descrizione: EVAL MOD W/UNITY GAIN THS4211
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: THS4211EVM-UG Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4211EVM-UG Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Single-Ended Voltage supply range: 5 V ~ 15 V, ±2.5 V ~ 7.5 V The 325MHz The 970 V/μs. Current-Output-Channel is 220mA The amplifier is of Voltage Feedback type. Included item: Board. IC package type: THS4211 Board type: Fully Populated. The product has 1 - Single channel per IC.

THS4211EVM-UG Image

THS4211EVM-UG

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4211EVM-UG Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual 5 V ~ 15 V, ±2.5 V ~ 7.5 V
  • -3db-Bandwidth 325MHz
  • Slew-Rate 970 V/μs
  • Current-Output-Channel 220mA
  • Amplifier-Type Voltage Feedback
  • Supplied-Contents Board
  • Utilized-IC-Part THS4211
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 19mA

THS4211EVM-UG

THS4211EVM-UG Specifications

THS4211EVM-UG FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Single-Ended.

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 5 V ~ 15 V, ±2.5 V ~ 7.5 V.

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 325MHz

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 970 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 220mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Voltage Feedback.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is THS4211.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top