THS1206M-EVM

Mfr. #: THS1206M-EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE FOR THS1206M
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: THS1206M-EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS1206M-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 6M. Data-Interface: Parallel 12 bits 1 units Input range: 1.5 ~ 3.5 V Included item: Board. IC package type: THS1206M This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the THS1206.

THS1206M-EVM Image

THS1206M-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS1206M-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 6M
  • Data-Interface Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 1.5 ~ 3.5 V
  • Supplied-Contents Board
  • Utilized-IC-Part THS1206M
  • Power-Typ-Conditions 186mW @ 5 V AVdd, 3.3 V DVdd
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of THS1206

THS1206M-EVM

THS1206M-EVM Specifications

THS1206M-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 6M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1.5 ~ 3.5 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is THS1206M.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed THS1206

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
56,74 USD
56,74 USD
10
53,91 USD
539,08 USD
100
51,07 USD
5 107,05 USD
500
48,23 USD
24 116,65 USD
1000
45,40 USD
45 396,00 USD
Top