TAS5611PHD2EVM

Mfr. #: TAS5611PHD2EVM
Produttore: Texas Instruments
Descrizione: EVAL MODULE FOR TAS5611PHD
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: TAS5611PHD2EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5611PHD2EVM Overview

Product belongs to the PurePath HD series. Output-Type: 1-Channel (Mono) or 2-Channel (Stereo) Voltage Supply Range: 16 V ~ 32.5 V Maximum Output Power of 250W x 1 @ 2 Ohm; 125W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TAS5611PHD Board type: Fully Populated.

TAS5611PHD2EVM Image

TAS5611PHD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5611PHD2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series PurePath HD
  • Output-Type 1-Channel (Mono) or 2-Channel (Stereo)
  • Voltage-Supply 16 V ~ 32.5 V
  • Max-Output-Power-x-Channels-Load 250W x 1 @ 2 Ohm; 125W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Utilized-IC-Part TAS5611PHD
  • Board-Type Fully Populated

TAS5611PHD2EVM

TAS5611PHD2EVM Specifications

TAS5611PHD2EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is PurePath HD.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 1-Channel (Mono) or 2-Channel (Stereo).

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 16 V ~ 32.5 V.

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is 250W x 1 @ 2 Ohm; 125W x 2 @ 4 Ohm.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TAS5611PHD

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
787,50 USD
787,50 USD
10
748,12 USD
7 481,25 USD
100
708,75 USD
70 875,00 USD
500
669,38 USD
334 687,50 USD
1000
630,00 USD
630 000,00 USD
Top