LP8860-Q1EVM

Mfr. #: LP8860-Q1EVM
Produttore: Texas Instruments
Descrizione: LED Lighting Development Tools Evaluation Module
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LP8860-Q1EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP8860-Q1EVM Overview

Product belongs to the LP8860-Q1 series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed LP8860-Q1 amplifier. 3 V ~ 48 V voltage input Current-Output-Channel is 150mA Output voltage: - Included item: Board. IC package type: LP8860-Q1 The product has 4, Non-Isolated outputs. This product operates at a 3 V to 48 V supply voltage for reliable performance. Output current: 150 mA Processor Core: LP8860-Q1

LP8860-Q1EVM Image

LP8860-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8860-Q1EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series LP8860-Q1
  • Product Evaluation Modules
  • Packaging Bulk
  • For-Use-With LP8860-Q1
  • Features Dimmable, I2C Interface
  • Voltage-Input 3 V ~ 48 V
  • Current-Output-Channel 150mA
  • Voltage-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part LP8860-Q1
  • Outputs-and-Type 4, Non-Isolated
  • Operating-Supply-Voltage 3 V to 48 V
  • Output-Current 150 mA
  • Core LP8860-Q1

LP8860-Q1EVM

LP8860-Q1EVM Specifications

LP8860-Q1EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LP8860-Q1.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is LP8860-Q1.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 3 V ~ 48 V

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 150mA.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LP8860-Q1

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 4, Non-Isolated

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3 V to 48 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 150 mA.

  • A: What is the Core of the product?

    Q: The Core of the product is LP8860-Q1.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
223,50 USD
223,50 USD
10
212,32 USD
2 123,25 USD
100
201,15 USD
20 115,00 USD
500
189,98 USD
94 987,50 USD
1000
178,80 USD
178 800,00 USD
Top