LP5562EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed LP5562 amplifier. 2.7 V ~ 5.5 V voltage input Current-Output-Channel is - Output voltage: - Included item: Board, Cable. IC package type: LP5562 The product has - outputs. This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. Processor Core: LP5562

LP5562EVM Image

LP5562EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5562EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series -
  • Product Evaluation Modules
  • Packaging Bulk
  • For-Use-With LP5562
  • Features Programmable
  • Voltage-Input 2.7 V ~ 5.5 V
  • Current-Output-Channel -
  • Voltage-Output -
  • Supplied-Contents Board, Cable
  • Utilized-IC-Part LP5562
  • Outputs-and-Type -
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Core LP5562

LP5562EVM

LP5562EVM Specifications

LP5562EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is LP5562.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 2.7 V ~ 5.5 V.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is -.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board, Cable.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LP5562

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is -.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5.5 V

  • A: At what frequency does the Core?

    Q: The product Core is LP5562.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
86,85 USD
86,85 USD
10
82,51 USD
825,08 USD
100
78,16 USD
7 816,50 USD
500
73,82 USD
36 911,25 USD
1000
69,48 USD
69 480,00 USD