LMX2581EVM

Mfr. #: LMX2581EVM
Produttore: Texas Instruments
Descrizione: EVAL BOARD FOR LMX2581
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LMX2581EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMX2581EVM Overview

Product belongs to the LMX2581 series. This product is categorized as Evaluation Boards Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 3760 MHz range is 0Hz to 2.2GHz. The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: Single Fractional-N PLL with VCO IC package type: LMX2581 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the LMX2581. 300 mA is 92 nA. SMA interface type

LMX2581EVM Image

LMX2581EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2581EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series LMX2581
  • Product Evaluation Boards
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 3760 MHz
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes Single Fractional-N PLL with VCO
  • Embedded -
  • Utilized-IC-Part LMX2581
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of LMX2581
  • Operating-Supply-Current 300 mA
  • Interface-Type SMA

LMX2581EVM

LMX2581EVM Specifications

LMX2581EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is LMX2581.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Frequency Synthesizers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 3760 MHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Frequency Synthesizer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Single Fractional-N PLL with VCO

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LMX2581.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LMX2581

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 300 mA

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
57,46 USD
57,46 USD
10
54,59 USD
545,92 USD
100
51,72 USD
5 171,85 USD
500
48,85 USD
24 422,65 USD
1000
45,97 USD
45 972,00 USD
Top