LMX2492EVM

Mfr. #: LMX2492EVM
Produttore: Texas Instruments
Descrizione: EVAL BOARD PLL WITH VCO LMX2492
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LMX2492EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMX2492EVM Overview

Product belongs to the LMX2492 series. This product is categorized as Evaluation Boards Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 5 GHz 10 GHz range is 0Hz to 2.2GHz. The Timing, PLL is the Main-Purpose. Primary-Attributes: Single Fractional-N PLL with VCO IC package type: LMX2492 This product operates at a 3 V 5 V supply voltage for reliable performance. This tool is designed for the LMX2492. SMA interface type

LMX2492EVM Image

LMX2492EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2492EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series LMX2492
  • Product Evaluation Boards
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 5 GHz 10 GHz
  • Main-Purpose Timing, PLL
  • Primary-Attributes Single Fractional-N PLL with VCO
  • Embedded -
  • Utilized-IC-Part LMX2492
  • Operating-Supply-Voltage 3 V 5 V
  • Tool-Is-For-Evaluation-Of LMX2492
  • Interface-Type SMA

LMX2492EVM

LMX2492EVM Specifications

LMX2492EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LMX2492

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Frequency Synthesizers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 5 GHz 10 GHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, PLL.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Single Fractional-N PLL with VCO

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LMX2492.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3 V 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LMX2492.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
457,36 USD
457,36 USD
10
434,50 USD
4 344,97 USD
100
411,63 USD
41 162,85 USD
500
388,76 USD
194 380,15 USD
1000
365,89 USD
365 892,00 USD
Top