LMK61E2-156M25EVM

Mfr. #: LMK61E2-156M25EVM
Produttore: Texas Instruments
Descrizione: LMK61E2-156M25EVM ULTRA-LOW-JITT
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LMK61E2-156M25EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK61E2-156M25EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Oscillators This product is designed LP5907 amplifier. This product's 156.25 MHz range is 0Hz to 2.2GHz. The Timing, Clock Oscillation is the Main-Purpose. Primary-Attributes: - IC package type: LMK61E2-156M25 This product operates at a 3.3 V 5.5 V supply voltage for reliable performance. This product is an Ultra low jitter fixed frequency oscillator evaluation module. This tool is designed for the LMK61E2-156M25SIA. USB interface type

LMK61E2-156M25EVM Image

LMK61E2-156M25EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK61E2-156M25EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Oscillators
  • For-Use-With LP5907
  • Frequency 156.25 MHz
  • Main-Purpose Timing, Clock Oscillation
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part LMK61E2-156M25
  • Operating-Supply-Voltage 3.3 V 5.5 V
  • Description-Function Ultra low jitter fixed frequency oscillator evaluation module
  • Tool-Is-For-Evaluation-Of LMK61E2-156M25SIA
  • Interface-Type USB

LMK61E2-156M25EVM

LMK61E2-156M25EVM Specifications

LMK61E2-156M25EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Oscillators.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed LP5907

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 156.25 MHz

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Clock Oscillation

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LMK61E2-156M25.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V 5.5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Ultra low jitter fixed frequency oscillator evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LMK61E2-156M25SIA.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
118,50 USD
118,50 USD
10
112,58 USD
1 125,75 USD
100
106,65 USD
10 665,00 USD
500
100,72 USD
50 362,50 USD
1000
94,80 USD
94 800,00 USD
Top