LM8365EVM

Mfr. #: LM8365EVM
Produttore: Texas Instruments
Descrizione: EVALUATION MODULE
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LM8365EVM Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM8365EVM Overview

This product is categorized as Evaluation Modules Type: Supervisory Circuits This product is an Micropower undervoltage supervisor evaluation module. This tool is designed for the LM8365. Our product measures 1.5 in x 1.15 in in dimensions for compact and convenient use. Input Voltage Range: 1 V to 6 V

LM8365EVM Image

LM8365EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM8365EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Product Evaluation Modules
  • Type Supervisory Circuits
  • Description-Function Micropower undervoltage supervisor evaluation module
  • Tool-Is-For-Evaluation-Of LM8365
  • Dimensions 1.5 in x 1.15 in
  • Input-Voltage 1 V to 6 V

LM8365EVM

LM8365EVM Specifications

LM8365EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Supervisory Circuits

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Micropower undervoltage supervisor evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LM8365.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 1.5 in x 1.15 in

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 1 V to 6 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
30,00 USD
30,00 USD
10
28,50 USD
285,00 USD
100
27,00 USD
2 700,00 USD
500
25,50 USD
12 750,00 USD
1000
24,00 USD
24 000,00 USD
Top