LM5122EVM-1PH

Mfr. #: LM5122EVM-1PH
Produttore: Texas Instruments
Descrizione: EVAL BOARD FOR LM5122
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: LM5122EVM-1PH Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM5122EVM-1PH Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Switching Controllers Bulk is the packaging method for this product This product is designed LM5122 amplifier. The DC/DC, Step Up is the Main-Purpose. 9 V ~ 20 V voltage input This product features 'Frequency-Switching' at 250kHz for optimal performance. Output voltage: 24V Boost regulator topology - Included item: Board. IC package type: LM5122 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 24 V This product is an Evaluation module provides the design engineer with a fully functional synchronous boost converter. This tool is designed for the LM5122. Input Voltage Range: 9 V to 20 V Output current: 4.5 A

LM5122EVM-1PH Image

LM5122EVM-1PH

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5122EVM-1PH Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Modules
  • Type Switching Controllers
  • Packaging Bulk
  • For-Use-With LM5122
  • Main-Purpose DC/DC, Step Up
  • Voltage-Input 9 V ~ 20 V
  • Frequency-Switching 250kHz
  • Current-Output 4.5A
  • Voltage-Output 24V
  • Regulator-Topology Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part LM5122
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 24 V
  • Description-Function Evaluation module provides the design engineer with a fully functional synchronous boost converter
  • Tool-Is-For-Evaluation-Of LM5122
  • Input-Voltage 9 V to 20 V
  • Output-Current 4.5 A

LM5122EVM-1PH

LM5122EVM-1PH Specifications

LM5122EVM-1PH FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is LM5122.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Up.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 9 V ~ 20 V.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is 250kHz.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 24V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Boost

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LM5122

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 24 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation module provides the design engineer with a fully functional synchronous boost converter.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LM5122

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 9 V to 20 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 4.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
140,94 USD
140,94 USD
10
133,89 USD
1 338,93 USD
100
126,85 USD
12 684,60 USD
500
119,80 USD
59 899,50 USD
1000
112,75 USD
112 752,00 USD
Top