EVM430-I2040S

Mfr. #: EVM430-I2040S
Produttore: Texas Instruments
Descrizione: EVAL BOARD FOR I2040S
Ciclo vitale: Nuovo da questo produttore.
Scheda dati: EVM430-I2040S Scheda dati
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
EVM430-I2040S Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Energy Meters Bulk is the packaging method for this product This product is designed MSP430i2040 amplifier. Trade name: MSP430. The Power Management, Energy/Power Meter is the Main-Purpose. Primary-Attributes: - IC package type: MSP430i2040 Maximum operating temperature of + 105 C Minimum operating temperature: - 40 C This product is an EVM430-i2040S embedded metering (sub-meter/e-meter). This tool is designed for the MSP430i2040. GPIO I2C SPI UART interface type Input Voltage Range: 2.2 V to 3.6 V

EVM430-I2040S Image

EVM430-I2040S

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EVM430-I2040S Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Energy Meters
  • Packaging Bulk
  • For-Use-With MSP430i2040
  • Tradename MSP430
  • Main-Purpose Power Management, Energy/Power Meter
  • Primary-Attributes -
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part MSP430i2040
  • Maximum-Operating-Temperature + 105 C
  • Minimum-Operating-Temperature - 40 C
  • Description-Function EVM430-i2040S embedded metering (sub-meter/e-meter)
  • Tool-Is-For-Evaluation-Of MSP430i2040
  • Interface-Type GPIO I2C SPI UART
  • Input-Voltage 2.2 V to 3.6 V

EVM430-I2040S

EVM430-I2040S Specifications

EVM430-I2040S FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Energy Meters.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed MSP430i2040

  • A: At what frequency does the Tradename?

    Q: The product Tradename is MSP430.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Energy/Power Meter

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is MSP430i2040.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 105 C.

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is EVM430-i2040S embedded metering (sub-meter/e-meter).

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is MSP430i2040.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is GPIO I2C SPI UART.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.2 V to 3.6 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantità
Prezzo unitario
est. Prezzo
1
114,63 USD
114,63 USD
10
108,90 USD
1 088,98 USD
100
103,17 USD
10 316,70 USD
500
97,44 USD
48 717,75 USD
1000
91,70 USD
91 704,00 USD
Top